Occupations/51-8013.00
Power Plant Operators
Control, operate, or maintain machinery to generate electric power. Includes auxiliary equipment operators.
Usually a high school diploma, plus some experience or short training.
AI automation risk
43%
Mixed exposure
Human characteristics
58%
Balanced human and task mix
Task orientation
61%
Mixed exposure
A day in this job
- Mostly routine
Monitor power plant equipment and indicators to detect evidence of operating problems.
- Mostly routine
Operate or maintain distributed power generation equipment, including fuel cells or microturbines, to produce energy on-site for manufacturing or other commercial purposes.
- Task
Control generator output to match the phase, frequency, or voltage of electricity supplied to panels.
The tasks we can read here lean routine. That sits next to the AI risk rank — it is not a forecast that the job disappears.
Core tasks
- 01Control generator output to match the phase, frequency, or voltage of electricity supplied to panels.
- 02Take regulatory action, based on readings from charts, meters and gauges, at established intervals.
- 03Control power generating equipment, including boilers, turbines, generators, or reactors, using control boards or semi-automatic equipment.
- 04Start or stop generators, auxiliary pumping equipment, turbines, or other power plant equipment as necessary.
- 05Monitor power plant equipment and indicators to detect evidence of operating problems.
- 06Operate or maintain distributed power generation equipment, including fuel cells or microturbines, to produce energy on-site for manufacturing or other commercial purposes.
Model drivers (O*NET 1–5)
- Repeating same tasks3.56
- Degree of automation2.96
- Time sitting2.99
- Originality (ability)2.50
- Conflict situations3.01
- Hands-on objects/tools3.93
- Outdoors / weather4.11
- Disease exposure1.45
- Decision freedom4.13
Top abilities
- Problem Sensitivity4.00
- Oral Comprehension4.00
- Deductive Reasoning3.88
- Near Vision3.75
- Oral Expression3.62
- Perceptual Speed3.25
- Information Ordering3.25
- Inductive Reasoning3.25
Essential skills
- Reading Comprehension3.12
- Active Listening3.25
- Writing3.00
- Speaking3.38
- Mathematics2.00
- Science2.00
- Critical Thinking3.75
- Active Learning2.88
- Learning Strategies2.38
- Monitoring3.25
CIP matches
Schools offering related programs
10 shown
Earnings are College Scorecard medians for that program, 1 and 2 years after completion. A dash means the Department suppressed the cell or the campus is not in the field file.
| Institution | Program | Tuition | Admit | Grad 6-yr | Earnings |
|---|---|---|---|---|---|
Rochester Community and Technical College Rochester, MN · Public | Power Plant Technology/Technician 15.1702 | $6,200 | 100% | 33% | 1 yr — 2 yr — Not reported |
Hennepin Technical College Brooklyn Park, MN · Public | Power Plant Technology/Technician 15.1702 | $6,200 | 100% | 38% | 1 yr — 2 yr — Not reported |
Ridgewater College Willmar, MN · Public | Power Plant Technology/Technician 15.1702 | $6,100 | 100% | 36% | 1 yr — 2 yr — Not reported |
Minnesota West Community and Technical College Granite Falls, MN · Public | Power Plant Technology/Technician 15.1702 | $6,000 | 100% | 37% | 1 yr — 2 yr — Not reported |
Iowa State University Ames, IA · Public | Power Plant Technology/Technician 15.1702 | $10,400 | 90% | 77% | 1 yr — 2 yr — Not reported |
Arizona State University Campus Immersion Tempe, AZ · Public | Power Plant Technology/Technician 15.1702 | $12,000 | 90% | 69% | 1 yr — 2 yr — Master's · CIP 15.17 |
Anoka Technical College Anoka, MN · Public | Power Plant Technology/Technician 15.1702 | $6,300 | 100% | 48% | 1 yr — 2 yr — Not reported |
Lake Superior College Duluth, MN · Public | Power Plant Technology/Technician 15.1702 | $5,900 | 100% | 38% | 1 yr — 2 yr — Not reported |
Columbus State Community College Columbus, OH · Public | Power Plant Technology/Technician 15.1702 | $4,800 | 100% | 25% | 1 yr — 2 yr — Not reported |
Macomb Community College Warren, MI · Public | Power Plant Technology/Technician 15.1702 | $4,200 | 100% | 22% | 1 yr — 2 yr — Not reported |
